City of Morgan Hill Adopted Budget FY 2016-17 and FY 2017-18

CITY OF MORGAN HILL

Scenarios - Sections Selected for Treatment

Printed: 03/12/2016

Interest: 3.00%

Inflation: 3.00%

Scenario: 2015 Recommended Budget ($5.4M, 16.5% PM)

Year: 2020

Last Inspected

Surf Type

Street Name

Begin Location End Location Street ID Section

Length Width Area

FC

PCI

Cost Rating Treatment

ST. JOSEPH DR

DIANA AVE

ROSEMARY CIR STJOSE 1010

37

8,510

8/12/2013

R AC

83

$13 2,252, 931 $54 4,251, 482 $22 2,212, 454 $26 4,251, 482 $52 2,109, 631 $23 2,280, 248 $13 2,094, 227 $27 2,958, 924 $67 1,999, 311

SEAL CRACKS

230

SUTTER BL

SERENE DR

JARVIS DR

SUTTER 1020

67

88,440

8/12/2013

A AC

87

SEAL CRACKS

1,320

TALBOT DR

N/O CALLE SIENA S/O LANCIA DR TALBOT 1020

37

14,060

8/12/2013

R AC

83

SEAL CRACKS

380

TENNANT AV

VINEYARD BLVD RAILROAD AV TENNAN 1020

72

42,768

8/12/2013

A AC/A C

87

SEAL CRACKS

594

VIA DE NINOS WY

LA MAR DR

LA ARBOLEDA VIANIN 1010

37

31,080

8/12/2013

R AC

82

SEAL CRACKS

840

VIA NARETTO

W/O CALLE SUENO CUL DE SAC VIANOR 1010

32

17,526

8/12/2013

R AC

85

SEAL CRACKS

482

WINTER CREEK WY

SHADOW BROOK CARRIAGE

WICRWY 1010

34

10,710

8/12/2013

R AC

86

SEAL CRACKS

315

WRIGHT AV

OAKGROVE DR DEL MONTE ST WRIGHT 1030

45

43,402

8/12/2013

C AC

87

SEAL CRACKS

951

ZINFANDEL CR

DOMAINE DR ZINFANEL CR ZINFCR 1010

34

51,000

8/12/2013

R AC

85

SEAL CRACKS

1,500

Treatment Total

$2,935

Year 2020 Total

$5,339,881

Year 2020 Area Total

4,741,541

Year: 2021

Last Inspected

Surf Type

Street Name

Begin Location End Location Street ID Section

Length Width Area

FC

PCI

Cost Rating Treatment

CAPRICE CT

END

GRAND PRIX WY CAPRIC 1010

40

8,448

8/12/2013

R AC

78

$8,769 14,244 CAPE SEAL

211

ENGLISH WALNUT CT WALNUT GROVE DR

END

ENGLIS 1010

24

5,064

8/12/2013

R AC

78

$5,257 13,971 CAPE SEAL

211

Treatment Total

$14,026

DIANA AV

CITY LIMIT SW/O BRADFORD

HILL RD

DIANAA 1100

100,544 32

8/12/2013

C AC

100

$435,553 11,846 2 IN AC OVERLAY

3,142

SAN PEDRO AV

RAILROAD AV BUTTERFIELD AV SANPED 1030A

40

20,000

8/12/2013

C AC

100

$86,640 11,846 2 IN AC OVERLAY

500

Treatment Total

$522,193

ASH CT

ALMOND WY

END

ASHCRT 1010

40

6,336

8/12/2013

R AC

100

$27,044 11,634 2 IN AC OVERLAY W/ FABRIC

158

MTC StreetSaver

** - Treatment from Project Selection

28 SS1026

Scenarios Criteria:

Made with