City of Morgan Hill Adopted Budget FY 2016-17 and FY 2017-18
CITY OF MORGAN HILL
Scenarios - Sections Selected for Treatment
Printed: 03/12/2016
Interest: 3.00%
Inflation: 3.00%
Scenario: 2015 Recommended Budget ($5.4M, 16.5% PM)
Year: 2020
Last Inspected
Surf Type
Street Name
Begin Location End Location Street ID Section
Length Width Area
FC
PCI
Cost Rating Treatment
ST. JOSEPH DR
DIANA AVE
ROSEMARY CIR STJOSE 1010
37
8,510
8/12/2013
R AC
83
$13 2,252, 931 $54 4,251, 482 $22 2,212, 454 $26 4,251, 482 $52 2,109, 631 $23 2,280, 248 $13 2,094, 227 $27 2,958, 924 $67 1,999, 311
SEAL CRACKS
230
SUTTER BL
SERENE DR
JARVIS DR
SUTTER 1020
67
88,440
8/12/2013
A AC
87
SEAL CRACKS
1,320
TALBOT DR
N/O CALLE SIENA S/O LANCIA DR TALBOT 1020
37
14,060
8/12/2013
R AC
83
SEAL CRACKS
380
TENNANT AV
VINEYARD BLVD RAILROAD AV TENNAN 1020
72
42,768
8/12/2013
A AC/A C
87
SEAL CRACKS
594
VIA DE NINOS WY
LA MAR DR
LA ARBOLEDA VIANIN 1010
37
31,080
8/12/2013
R AC
82
SEAL CRACKS
840
VIA NARETTO
W/O CALLE SUENO CUL DE SAC VIANOR 1010
32
17,526
8/12/2013
R AC
85
SEAL CRACKS
482
WINTER CREEK WY
SHADOW BROOK CARRIAGE
WICRWY 1010
34
10,710
8/12/2013
R AC
86
SEAL CRACKS
315
WRIGHT AV
OAKGROVE DR DEL MONTE ST WRIGHT 1030
45
43,402
8/12/2013
C AC
87
SEAL CRACKS
951
ZINFANDEL CR
DOMAINE DR ZINFANEL CR ZINFCR 1010
34
51,000
8/12/2013
R AC
85
SEAL CRACKS
1,500
Treatment Total
$2,935
Year 2020 Total
$5,339,881
Year 2020 Area Total
4,741,541
Year: 2021
Last Inspected
Surf Type
Street Name
Begin Location End Location Street ID Section
Length Width Area
FC
PCI
Cost Rating Treatment
CAPRICE CT
END
GRAND PRIX WY CAPRIC 1010
40
8,448
8/12/2013
R AC
78
$8,769 14,244 CAPE SEAL
211
ENGLISH WALNUT CT WALNUT GROVE DR
END
ENGLIS 1010
24
5,064
8/12/2013
R AC
78
$5,257 13,971 CAPE SEAL
211
Treatment Total
$14,026
DIANA AV
CITY LIMIT SW/O BRADFORD
HILL RD
DIANAA 1100
100,544 32
8/12/2013
C AC
100
$435,553 11,846 2 IN AC OVERLAY
3,142
SAN PEDRO AV
RAILROAD AV BUTTERFIELD AV SANPED 1030A
40
20,000
8/12/2013
C AC
100
$86,640 11,846 2 IN AC OVERLAY
500
Treatment Total
$522,193
ASH CT
ALMOND WY
END
ASHCRT 1010
40
6,336
8/12/2013
R AC
100
$27,044 11,634 2 IN AC OVERLAY W/ FABRIC
158
MTC StreetSaver
** - Treatment from Project Selection
28 SS1026
Scenarios Criteria:
Made with FlippingBook