CITY OF MORGAN HILL Capital Improvement Program
Project
Project No.
302018
Sewer System Repair and Replacements
Category
Wastewater
Department
Engineering & Utilities
Council Priorities Enhancing Public Safety, Maintaining Fiscal Responsibility, Protecting the Environment
Location
Various Locations within Service Area
Project Description This project is intended to identify, prioritize, and implement needed repairs and improvements for various pipeline groupings to ensure the optimum level of sewer service to the Public. Key tasks identified for this effort include: 1. Compliance Inspections and repairs 2. Pipeline Improvements (P1-5) 3. Repair & Replacements (Groups 1-9) 1. Compliance Inspections and Repairs The City proactively works to maintain the general condition of the existing sewer system and this project consists of identifying areas of the existing sewer system that do not comply with existing design and construction standards. Additionally, this project includes identifying areas of the existing sewer system requiring repair. 2. Pipeline Improvements(P1-5) City Staff has identified priority sections of pipeline intended to be replaced in the near term. These pipelines were identified as part of the repair and replacement program included in the 2017 Sewer SystemMaster Plan and were considered failed due to deteriorated conditions or other operational considerations.
2021-2026 Six Year Capital Improvement Program
Page 61 of 127