City of Morgan Hill Public Safety Master Plan
WORKLOAD ANALYSIS
The emergency call volume managed by CAL FIRE units is not excessively high, even when considering the geographic service area and the resident and commuting population being served. The total call volume handled by CAL FIRE units in the 12-month period we observed was 5,508 calls. This equates to 15.1 calls per day. The average duration of each call was approximately 43 minutes. Fire calls had an average call duration of 62.6 minutes, and EMS calls lasted an average of 32.4 minutes. On average, all CAL FIRE units combined were deployed a total of 933.1 minutes (15.5 hours) each day. Table 4-5 is an analysis of the annual runs and deployed time by call type.
TABLE 4-5: Annual Runs and Deployed Time by Call Type
Avg. Deployed Min. per Day
Percent of Total Hours
Avg. Deployed Min. per Run
Total Annual Hours
Total Annual Runs
Avg. Runs per Day
Call Type
EMS
32.5
1,761.0
31.0
289.5
3,251
8.9
MVA
32.2
520.1
9.2
85.5
970
2.7
EMS Total
32.4
2,281.1
40.2
375.0
4,221
11.6
False alarm
26.6
265.1
4.7
43.6
598
1.6
Good intent
27.5
102.1
1.8
16.8
223
0.6
Hazard
39.2
146.3
2.6
24.1
224
0.6
Outside fire
106.9
1,170.3
20.6
192.4
657
1.8
Public service
32.4
252.9
4.5
41.6
468
1.3
Structure fire
155.2
548.3
9.7
90.1
212
0.6
Fire Total
62.6
2,485.1
43.8
408.5
2,382
6.5
Automatic aid
32.0
148.6
2.6
24.4
279
0.8
Cancelled
16.2
119.6
2.1
19.7
442
1.2
Mutual aid
64.0
642.3
11.3
105.6
602
1.6
Other Total
41.3
910.5
16.0
149.7
1,323
3.6
Total
43.0
5,676.7
100.0
933.1
7,926
21.7
Note: Each dispatched unit is a separate “run.” As multiple units are dispatched to a call, there are more runs than calls. Therefore, CAL FIRE responded to 15.1 calls per day and had 21.7 runs per day.
When we look at the workload by unit, we can evaluate the average runs each day by unit and the total time each units is deployed. From this analysis we have determined that the busiest unit (Engine-67, operating from Station #1) is deployed an average of 148 minutes (approximately 2.46 hours each 24 hours), and Engine-69 (Station #3) was the least busy unit, operating on average, 69.4 minutes (approximately 1 hour 10 minutes) each day. Table 4-6 is an analysis of unit workload.
35
Made with FlippingBook