City of Morgan Hill Sewer System Master Plan 2017
Table 5.2 Sewer Flow Distribution Sewer System Master Plan City of Morgan Hill
Average Dry Weather Flows 1 PRELIMINARY
Area
Percent of Total
Percent of Total
Basin
Flows
Acres
(%)
(gpm)
(%)
Basin 1
817
9%
127
7%
Basin 2
911
10% 169
9%
Basin 3
345
4%
117
6%
Basin 4
823
9%
147
8%
Basin 5
807
8%
218
11%
Basin 6
1,918
20% 345
18%
Basin 7
367
4%
121
6%
Basin 8
398
4%
136
7%
Basin 9
1,094
12% 157
8%
Basin 10
454
5%
145
8%
Harding
1,568
17% 234
12%
Total
9,500
1,916
100%
100%
10/31/2016
Note: 1. Based on 2012 water billing records and adequate return to sewer factor.
Made with FlippingBook - Online magazine maker