7.3.1 Butterfield Trunk This section documents pipeline improvements within the Butterfield Trunk sewer service area. x BT-P1 : Construct a new 8-inch gravity sewer in Peet Road from 3,000 feet east of Cochrane Road to Cochrane Road. x BT-P2: Replace the existing 10-inch gravity sewer along North-Bound US 101 from 900 feet north of Cochrane Road to intersection of Cochrane Road and North-Bound US 101. 7.3.2 Hale-Llagas Trunk This section documents pipeline improvements within the Hale-Llagas Trunk sewer service area. x HL-P1 : Replace the existing 8-inch gravity sewer along Llagas Creek Drive from Eagle Springs Court to Hale Avenue. It should be noted that the condition assessment report included in Appendix C of this 2017 Master Plan also recommends replacement of this 8- inch trunk due to its adverse conditions. 7.3.3 East Dunne Trunk This section documents pipeline improvements within the Hale-Llagas Trunk sewer service area. x ED-P1 : Construct a new 8-inch gravity sewer in Diana Avenue from Murphy Avenue to Condit Road. x ED-P2 : Replace the existing 8-inch gravity sewer along Dunne Avenue from 230 feet east of Murphy Avenue to Condit Road. x ED-P3 : Replace the existing 8-inch and 10-inch gravity sewer along Dunne Avenue from Condit Road to 530 feet east of Walnut Grove Drive. 7.3.4 Hale-Monterey Trunk This section documents pipeline improvements within the Hale-Monterey Trunk sewer service area. x HM-P1 : Construct a new 12-inch gravity sewer along Dunne Avenue from Monterey Road to Railroad Avenue. 7.3.5 Railroad-Monterey Trunk This section documents pipeline improvements within the Railroad-Monterey Trunk sewer service area. x RM-P1 : Replace the existing 10-inch gravity sewer along San Pedro Avenue from Butterfield Boulevard to Railroad Avenue.

August 2017

7-7

City of Morgan Hill Sewer System Master Plan

Made with FlippingBook - Online magazine maker