City of Morgan Hill Sewer System Master Plan 2017
City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study
SITE 1 Site Capacity and Surcharge Summary
Realtime Flow Levels with Rainfall Data over Monitoring Period
20
0.0
18
Diameter
0.2
16
0.4
14
0.6
12
0.8
10
1.0
8
1.2
Rain (in)
Level (in)
6
1.4
4
1.6
2
1.8
0
2.0
02/25
02/26
02/27
02/28
03/01
03/02
03/03
03/04
03/05
03/06
03/07
03/08
03/09
03/10
03/11
03/12
03/13
03/14
03/15
03/16
Pipe Diameter:
18 inches
Peak Measured Level:
3.73
inches
Peak d/D Ratio:
0.21
12-0248 AEG Morgan Hill FM and II Rpt.doc
Page S1 - 6
Made with FlippingBook - Online magazine maker