City of Morgan Hill Sewer System Master Plan 2017

City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study

SITE 6 Weekly Level, Velocity and Flow Hydrographs 2/24/2014 to 3/3/2014

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Lev

18

Avg Level: 9.03 in. Peak Level: 12.52 in. Min Level: 4.59 in.

16

14

12

10

8

6 Level (in)

4

2

0

2.0

Vel

Avg Velocity: 0.65 fps Peak Velocity: 1.11 fps Min Velocity: 0.30 fps

1.8

1.6

1.4

1.2

1.0

0.8

0.6 Velocity (fps)

0.4

0.2

0.0

Rain

Flow

BLFlow

Total Weekly Rainfall: 3.17 inches

1.60

0.0

1.40

0.2

1.20

0.4

1.00

0.80

0.6

0.60

0.8

Flow (mgd)

Rain (in/hr)

0.40

1.0

0.20

0.00

1.2

2/24

2/25

2/26

2/27

2/28

3/1

3/2

Avg Flow: 0.379 mgd Peak Flow: 0.912 mgd Min Flow: 0.098 mgd

12-0248 AEG Morgan Hill FM and II Rpt.doc

Page S6 - 8

Made with FlippingBook - Online magazine maker