City of Morgan Hill Sewer System Master Plan 2017
City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study
SITE 8 Weekly Level, Velocity and Flow Hydrographs 3/3/2014 to 3/10/2014
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Lev
18
Avg Level: 5.08 in. Peak Level: 6.63 in. Min Level: 3.82 in.
16
14
12
10
8
6 Level (in)
4
2
0
1.8
Vel
Avg Velocity: 0.61 fps Peak Velocity: 1.02 fps Min Velocity: 0.28 fps
1.6
1.4
1.2
1.0
0.8
0.6
Velocity (fps)
0.4
0.2
0.0
Rain
Flow
BLFlow
Total Weekly Rainfall: 0.21 inches
0.70
0.0
0.60
0.2
0.50
0.4
0.40
0.6
0.30
0.8
Flow (mgd)
Rain (in/hr)
0.20
1.0
0.10
0.00
1.2
3/3
3/4
3/5
3/6
3/7
3/8
3/9
Avg Flow: 0.162 mgd Peak Flow: 0.328 mgd Min Flow: 0.052 mgd
12-0248 AEG Morgan Hill FM and II Rpt.doc
Page S8 - 9
Made with FlippingBook - Online magazine maker