City of Morgan Hill Sewer System Master Plan 2017

City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study

SITE 9 Weekly Level, Velocity and Flow Hydrographs 2/24/2014 to 3/3/2014

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Lev

14

Avg Level: 4.28 in. Peak Level: 6.36 in. Min Level: 2.44 in.

12

10

8

6

Level (in)

4

2

0

2.5

Vel

Avg Velocity: 0.84 fps Peak Velocity: 1.32 fps Min Velocity: 0.33 fps

2.0

1.5

1.0

Velocity (fps)

0.5

0.0

Rain

Flow

BLFlow

Total Weekly Rainfall: 3.01 inches

0.60

0.0

0.50

0.2

0.40

0.4

0.30

0.6

0.20 Flow (mgd)

0.8

Rain (in/hr)

0.10

1.0

0.00

1.2

2/24

2/25

2/26

2/27

2/28

3/1

3/2

Avg Flow: 0.169 mgd Peak Flow: 0.408 mgd Min Flow: 0.030 mgd

12-0248 AEG Morgan Hill FM and II Rpt.doc

Page S9 - 8

Made with FlippingBook - Online magazine maker