City of Morgan Hill Sewer System Master Plan 2017
City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study
HARDING Period Flow Summary: Daily Flow Totals
Avg Period Flow: 2.717 MGal Peak Daily Flow: 3.539 MGal Min Daily Flow: 2.591 MGal
Total Period Rainfall: 3.36 inches
4.00
0.0
0.5
3.50
1.0
3.00
1.5
2.50
2.0
2.00
2.5
3.0
Flow (MGal)
1.50
Rainfall (in/day)
3.5
1.00
4.0
0.50
4.5
0.00
5.0
3/1
3/2
3/3
3/4
3/5
3/6
3/7
3/8
3/9
2/24
2/25
2/26
2/27
2/28
3/10
3/11
3/12
3/13
3/14
3/15
3/16
12-0248 AEG Morgan Hill FM and II Rpt.doc
Page Harding - 3
Made with FlippingBook - Online magazine maker