City of Morgan Hill Sewer System Master Plan 2017
City of Morgan Hill Sanitary Sewer Flow Monitoring and I/I Study
HARDING Site Capacity and Surcharge Summary
Realtime Flow Levels with Rainfall Data over Monitoring Period
25
0.0
0.2
Diameter
20
0.4
0.6
15
0.8
1.0
10
1.2
Rain (in)
Level (in)
1.4
5
1.6
1.8
0
2.0
02/25
02/26
02/27
02/28
03/01
03/02
03/03
03/04
03/05
03/06
03/07
03/08
03/09
03/10
03/11
03/12
03/13
03/14
03/15
03/16
Pipe Diameter:
21 inches
Peak Measured Level:
13
inches
Peak d/D Ratio:
0.62
12-0248 AEG Morgan Hill FM and II Rpt.doc
Page Harding - 6
Made with FlippingBook - Online magazine maker