City of Morgan Hill Sewer System Master Plan 2017

Dry Weather Flow

500

Weekend

Weekday

400

300

200

100 Flow (gpm)

0

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

500

0.0

400

0.2

300

0.4

200

0.6

Flow (gpm)

100

0.8

0

1.0

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

0 100 200 300 400 500 600 700

Flow (gpm)

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

LEGEND

Figure 7 Site 6 Calibration Barrett Ave. and Railroad Ave. Sewer System Master Plan City of Morgan Hill

PRELIMINARY

Rain Event Hydraulic Model

V&A Flow Monitoring V&A Flow Monitoring

June 29, 2016

Made with FlippingBook - Online magazine maker