City of Morgan Hill Sewer System Master Plan 2017

8''

KRUSE RANCH

HELENE

6''

OAK LEAF

LIVE OAK

8''

SARA JANE

6''

6''

6''

OAKRIDGE

8''

8''

8''

6''

8''

DUNNE

8''

8''

8''

8''

OAK LEAF

6''

6''

OAK HILL

JACKSON OAKS

OAK VIEW

6''

6''

6''

6''

6''

RUSTLING OAK

6''

OAKWOOD

6''

6''

6''

TRAIL

FLAMING OAK

6''

6''

MIRA BELLA

Group 1 Sewer System

Legend

PRELIMINARY

Open Cut Replacement Trenchless Rehabilitation Trenchless Replacement

0 LF 4,886 LF 2,739 LF

Open Cut Replacement Trenchless Rehabilitation Trenchless Replacement

$3,694,750 $370,690 $0

Extreme Risk High Risk

Trenchless Rehabilitation Trenchless Replacement Point Repair Pipes Roads

Grand Total Point Repair

129 LF Point Repair

$35,390

Sewer Condition Assessment City of Morgan Hill

7,754 LF

Grand Total

$4,101,000

5 GIS

2. Costs and lengths are preliminary and intended for basic planning purposes. Improvements are subject to revision for both alignment, and rehab method based on more detailed review for design. Notes: 1. Costs include master plan contingencies of 30% for unforeseen events and 30% for other costs including: design, environmental, legal, construction management, and project administration.

0

250

500

1,000

Feet File Path: P:\xGIS\GIS_Projects\Morgan_Hill\Sewer\170217-SS Cond RiskAssessment\Rehab Costs\MH_Fig6-RehabCosts_Group1_061417.mxd Updated: June 14, 2017