City of Morgan Hill Sewer System Master Plan 2017

6''

CHRISTEPH

CALLE MAZATAN

LLAGAS CREEK

6''

CENTRAL

6''

MONTEREY

ENDERSON

LLAGAS

WRIGHT

6''

8''

6''

6''

EL TORO

MCLAUGHLIN

8''

BUTTERFIELD

WAUGH

BRISCOE

6''

6''

15''

6''

LINDO

6''

12''

LONGVIEW

6''

12''

6''

KEYSTONE

6''

1ST

DRIVEWAY

HEIDI

DEPOT

6''

2ND

8''

CREST

HALE

SABINI

1ST

8''

8''

6''

6''

4TH

WARREN

3RD

BONNIE VIEW

DE WITT

6''

5TH

NOB HILL

6''

6''

HILL

6''

6''

6''

6''

DUNNE

6''

6''

8''

6''

MAIN

PEAK

NOBLE

6''

ALKIRE

Group 4 Sewer System

PRELIMINARY

Legend

Open Cut Replacement Trenchless Rehabilitation Trenchless Replacement

567 LF 8,714 LF 325 LF

Open Cut Replacement Trenchless Rehabilitation Trenchless Replacement

$1,533,400 $198,120 $434,500 $375,380 $206,840

Extreme Risk High Risk Moderate Risk

Open Cut Replacement Trenchless Rehabilitation Trenchless Replacement Point Repair Pipes Roads

Grand Total Point Repair

692 LF Point Repair

Sewer Condition Assessment City of Morgan Hill

10,299 LF

Grand Total

5 GIS

2. Costs and lengths are preliminary and intended for basic planning purposes. Improvements are subject to revision for both alignment, and rehab method based on more detailed review for design. Notes: 1. Costs include master plan contingencies of 30% for unforeseen events and 30% for other costs including: design, environmental, legal, construction management, and project administration.

0

250

500

1,000

Feet File Path: P:\xGIS\GIS_Projects\Morgan_Hill\Sewer\170217-SS Cond RiskAssessment\Rehab Costs\MH_Fig6-RehabCosts_Group4_061417.mxd Updated: June 14, 2017