City of Morgan Hill Water System Master Plan 2017
BR-P2: Construct a new 10-inch pipeline in Cochrane Road between Half Road and approximately 1,700 feet north of Half Road.
BR-P3: Construct a new 12-inch pipeline in Half Road between Avenida de los Padres and approximately 450 feet south of Avenida de los Padres.
BR-P4: Replace existing 8-inch pipeline with a new 10-inch pipeline in Mission View Drive between Cochrane Road and 2,100 feet northwest of Cochrane Road.
BR-P5: Construct a new 12-inch pipeline in De Paul Road between Half Road and 2,100 feet northwest of Half Road.
BR-P6: Construct a new 12-inch pipeline in Half Road between Serene Road and Condit Road.
7.8.2
Nob Hill Pressure Zone
This section documents pipeline improvements within the Nob Hill Pressure Zone.
NH-P1: Construct a new 12-inch pipeline in Hale Avenue Extension between Spring Avenue and Main Avenue.
NH-P2: Replace existing 4-inch pipeline with a new 8-inch pipeline in Spring Avenue between Del Monte Avenue and Monterey Road.
NH-P3: Replace existing 10-inch pipeline with a new 16-inch pipeline in San Pedro Avenue between Butterfield Boulevard and Railroad Avenue.
NH-P4: Replace existing 10-inch pipeline with a new 16-inch pipeline in Railroad Avenue between San Pedro Avenue and approximately 600 feet north of Mast Street.
NH-P5: Replace existing 6-inch pipeline with a new 16-inch pipeline in Railroad Avenue between S600 feet north of Mast Street and Mast Street.
NH-P6: Construct a new 10-inch pipeline in San Pedro Avenue between Peppertree Drive and Hill Road.
NH-P7: Construct a new 10-inch pipeline in Hill Road between San Pedro Avenue and Tennant Avenue.
NH-P8: Construct a new 10-inch pipeline in Tennant Avenue between Hill Road and Condit Road.
NH-P9: Construct a new 10-inch pipeline in Monterey Road between John Wilson way and Middle Avenue.
NH-P10: Construct a new 10-inch pipeline in right of way between Monterey Road and Olive Avenue.
June 2017
7-23
City of Morgan Hill Water System Master Plan