City of Morgan Hill Water System Master Plan 2017
Table 7.10 Pipeline Repair and Replacement Water System Master Plan City of Morgan Hill
PRELIMINARY
Pipeline Improvements
Existing Diameter
Improv. No.
Pressure Zone
Alignment
Limits
New/Parallel/ Replace
Diam. 2
Length
(in)
(in)
(ft)
RP-1
Holiday Lake
Shady Ln
6
Replace
6
2,550
From Holiday Dr to Holiday Dr
From Jackson Oaks Dr to approx 550' ne/o Jackson Oaks Dr From Jackson Oaks Dr to approx 700' s/o Jackson Oaks Dr
RP-2
Jackson Oaks
Hill Top Ct
8
Replace
8
550
RP-3
Jackson Oaks
Oak View Ct
8
Replace
8
700
RP-4
Holiday Lake
Holiday Tank Site From Holiday Lake Tanks to Manzanita Dr
8
Replace
8
800
RP-5
Holiday Lake
Manzanita Dr
6
Replace
6
1,650
From Holiday Dr to end of Manzanita Dr
RP-6
Holiday Lake
Raccoon Ct
6
Replace
6
1,700
From Holiday Ct to end of Manzanita Dr
RP-7
Nob Hill
First St
6
Replace
6
600
From Monterey Rd to Depot St
Hydropneumatic Zone
From Jackson Oaks Hydropneumatic tank to Jackson Oaks Dr
RP-8
Oak Canyon Dr
8
Replace
8
600
2/15/2017
Note: 1. Planned operational improvements include pipelines requiring replacement due to deteriorated condition or other operational issue, as identified by City staff. 2. Where feasible, it is recommended that 6-inch pipelines be upsized to 8-inch pipelines.