City of Morgan Hill Water System Master Plan 2017
Table 3.2 Historical Monthly Water Production (2013-2015) Water System Master Plan City of Morgan Hill
PRELIMINARY
2013
2014
2015
Daily Production
Peaking Factor Month to Avg Factor
Daily Production
Peaking Factor Month to Avg Factor
Daily Production
Peaking Factor Month to Avg Factor
Monthly
Monthly
Monthly
Month
Percent of Annual
Percent of Annual
Percent of Annual
Average Day Production
Average Day Production
Average Day Production
(MGD)
(MGM)
(%)
(MGD)
(MGM)
(%)
(MGD)
(MGM)
(%)
January
3.40
105
4%
0.43
5.74
178
7%
0.87
4.03
125
5%
0.79
February
4.12
119
4%
0.49
4.39
127
5%
0.63
3.73
108
4%
0.68
March
5.55
172
6%
0.71
4.45
138
6%
0.68
4.47
139
5%
0.87
April
8.12
244
8%
1.00
6.26
188
8%
0.92
5.32
160
6%
1.01
May
9.91
307
11%
1.27
8.18
254
10%
1.25
5.60
174
7%
1.09
June
9.86
296
10%
1.22
8.47
254
10%
1.25
6.31
189
7%
1.19
1.50
1.48
1.30
July
11.73
364
12%
9.70
301
12%
6.65
206
8%
August
10.25
318
11%
1.31
8.94
277
11%
1.36
6.60
205
8%
1.29
September
10.37
311
11%
1.28
8.97
269
11%
1.32
6.52
196
7%
1.23
October
9.40
291
10%
1.20
7.13
221
9%
1.09
5.96
185
7%
1.16
November
7.22
217
7%
0.89
4.22
127
5%
0.62
3.81
114
4%
0.72
December
5.44
169
6%
0.69
3.50
108
4%
0.53
3.37
104
4%
0.66
Total
2,912
2,442
1,904
Average Value Maximum Value
7.95
243 364
6.66
204 301
5.20
159 206
1.50
1.48
1.30
3/22/2016
Notes:
1. Source: 2013 and 2014 monthly production as extracted from Well Production file received May 6, 2015. 2. Source: 2015 monthly production as extracted from Well Production file received March 17, 2016
Made with FlippingBook flipbook maker