City of Morgan Hill Water System Master Plan 2017
Table 7.8 Proposed Pump Stations Water System Master Plan City of Morgan Hill
PRELIMINARY
Pump Station Capacity
Source Pressure Zone
Destination Pressure Zone
No. of Pumps
Pump Status
Design Capacity
Elevation
Name
Total
Firm
(ft)
(gpm)
(gpm)
(gpm)
(gpm)
(gpm)
New Pump Stations
Holiday Zone No. 1
East Dunne 1,2
430
2,700
1,800
3
Duty
900
Nob Hill
Duty
900
Standby
900
Holiday Zone No. 1
Holiday Lake 2
780
2,200
1,650
4
Duty
550
Holiday Lake
Duty
550
Duty
550
Standby
550
2/15/2017
Notes:
1. East Dunne Pump Station to replace existing East Dunne Pump Stations 1, 2, and 3. 2. Future capacity of East Dunne and Holiday Lake pump stations consistent with "Holiday Lake Zone Improvements" prepared by Akel Engineering Group July 2015.