City of Morgan Hill Water System Master Plan 2017
RP-7: Replace the existing 6-inch pipeline with a new 6-inch pipeline in First Street between Monterey Road and Depot Street.
RP-8: Replace the existing 8-inch pipeline with a new 8-inch pipeline from the Jackson Oaks hydropneumatic tank and Jackson Oaks Drive.
June 2017
7-26
City of Morgan Hill Water System Master Plan
Made with FlippingBook flipbook maker