Sewer System Repair and Replacements
Project
Project No.
302018
Engineering & Utilities
Category
Wastewater
Department
Council Priorities Enhancing Public Safety, Maintaining Fiscal Responsibility, Protecting the Environment
Location
Various Locations within Service Area
Project Description This project is intended to identify, prioritize, and implement needed repairs and improvements for various pipeline groupings to ensure the optimum level of sewer service to the Public.
Key tasks identified for this effort include: 1. Pipeline Improvements (P1-5)
2. Repair & Replacements (Groups 1-9) 3. Compliance Inspections and Repairs
1. Pipeline Improvements (P1-5) City Staff has identified priority sections of pipeline intended to be replaced in the near term. These pipelines were identified as part of the repair and replacement program included in the 2017 Sewer System Master Plan and were considered failed due to deteriorated conditions or other operational considerations. 2. Repair & Replacements (Groups 1-9) The 2017 Sewer System Master Plan identified various rehabilitation and replacement improvements throughout the City. These projects were further classified into specific groupings based on location.
2019-2024 Six-Year Capital Improvement Program