Adopted Capital Improvement Program Budget FY 2024-25 through FY 2029-30

City of Morgan Hill Capital Improvement Program FY 2024-25 – FY 2029-30

Project Name: Existing Joint Trunk Repair

Project No. WW3012

Category

Wastewater

Funding Source(s)

F643 - Sewer CIP Fund

Council Priorities Protecting the Environment and Preserving Open Space and Agricultural Land Enhancing Public Safety and Quality of Life Maintaining and Enhancing Infrastructure Healthy Community

Strategic Planning Documents

2024 Sewer System Master Plan

Project Description The goal of this project is to enhance the efficiency and longevity of the existing sewer system by rehabilitating sewer lines and improving manhole structures. The project will address issues such as leaks, deterioration, and structural deficiencies. Key tasks identified for this effort include: 1. Line 3,145 linear feet of pipes and 40 manholes at various locations within the service area (RR-J1-5). 2. Line 1,072 linear feet of a 36” diameter pipe between Highland Ave and Fitzgerald Ave. (RR-J6). 3. Line/Open Cut 20,627 linear feet of a 36” diameter pipe south of Day Rd. (RR-J7). Projects outlined will be undertaken in partnership with the City of Gilroy, which will fund 25-50% of project costs associated with repair work based on the shared ownership of the joint trunk line. Project Justification This type of project is necessary for the following reasons: 1. Improved Infrastructure: Enhanced sewer lines and manholes will reduce leaks and improve overall system performance. 2. Longevity: Coating manholes and lining sewer lines will extend their lifespan. 3. Reduced Emergency Failures: The project aims to minimize emergency failures in the sewer system.

Made with FlippingBook flipbook maker