City of Morgan Hill Sewer System Master Plan 2017

Dry Weather Flow

200

Weekday

Weekend

150

100

50 Flow (gpm)

0

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

250

0.0

200

0.2

150

0.4

100

0.6

Flow (gpm)

50

0.8

0

1.0

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

100 150 200 250 300 350

Flow (gpm)

0 50

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

LEGEND

Figure 10 Site 9 Calibration Hale Ave and n/o Wright Ave. Sewer System Master Plan City of Morgan Hill

PRELIMINARY

Rain Event Hydraulic Model

V&A Flow Monitoring V&A Flow Monitoring

June 29, 2016

Made with FlippingBook - Online magazine maker