City of Morgan Hill Sewer System Master Plan 2017
Dry Weather Flow
200
Weekend
Weekday
150
100
50 Flow (gpm)
0
0
5
10
15
20
25
30
35
40
45
Time (hr)
Wet Weather Event 1 (02/26/14 - 02/27/14)
100 120 140 160 180
0.0
0.2
0.4
0 20 40 60 80
0.6
Flow (gpm)
0.8
1.0
Rain Intensity (in/hr)
0
5
10
15
20
25
30
35
40
45
Time (hr)
Wet Weather Event 2 (02/28/14 - 03/01/14)
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
250
200
150
100
Flow (gpm)
50
Rain Intensity (in/hr)
0
0
5
10
15
20
25
30
35
40
45
Time (hr)
LEGEND
Figure 11 Site 10 Calibration w/o Monterey Rd. and n/o California Ave. Sewer System Master Plan City of Morgan Hill
PRELIMINARY
Rain Event Hydraulic Model
V&A Flow Monitoring V&A Flow Monitoring
June 29, 2016