City of Morgan Hill Sewer System Master Plan 2017

Dry Weather Flow

1,000 1,500 2,000 2,500 3,000 3,500

Weekend

Weekday

Flow (gpm)

0 500

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

1,000 1,500 2,000 2,500 3,000

0.0

0.2

0.4

0.6

Flow (gpm)

0.8

0 500

1.0

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

1,000 1,500 2,000 2,500 3,000 3,500 4,000

Flow (gpm)

0 500

Rain Intensity (in/hr)

0

5

10

15

20

25

30

35

40

45

Time (hr)

LEGEND

Figure 12 Harding Calibration Harding Ave. and n/o Highland Ave. Sewer System Master Plan City of Morgan Hill

PRELIMINARY

Rain Event Hydraulic Model

V&A Flow Monitoring V&A Flow Monitoring

June 29, 2016

Made with FlippingBook - Online magazine maker