City of Morgan Hill Water System Master Plan 2017

Table 7.9 Schedule of Improvements Water System Master Plan City of Morgan Hill

PRELIMINARY

Pipeline Improvements

Existing Diameter

Improv. No.

Pressure Zone

Alignment

Limits

New/Parallel /Replace

Diam.

Length

(in)

(in)

(ft)

WD-T1

Woodland Demolish existing 0.03 MG Woodland tank and replace with 0.25 MG tank

New

0.25

HL-T1

Holiday 1

Dunne Ave approx 500' ne/o Flaming Oak Ln

New

0.85

Proposed Pumping Capacity (gpm)

Groundwater Well Improvements

BR-W1

Boys Ranch

Burnett Ave Approx 6,000' ne/o Monterey Ave

New

800

NH-W2

Nob Hill

Butterfield Blvd 400' E of Railroad Ave and Fisher Ave

New

800

Proposed Capacity (gpm)

Pump Station Improvements

NH-PS1

Nob Hill

Dunne Ave and Magnolia Wy

New

3 @ 900 gpm

HL-PS1

Holiday 1

Dunne Ave approx 500' ne/o Flaming Oak Ln

New

4 @ 550 gpm

Proposed Size (in)

Pressure Reducing Valve Improvements

HL-PRV1

Holiday 1

Thomas Gr approx 1,100' w/o Gnarled Oak Ln

New

3

2/16/2017

Made with FlippingBook flipbook maker